The company has built two railway bridges: one across the river of Karakum (363 m), and the other one across the channel flowing out the reservoir named after the 15th Anniversary of Independence (256 m). These bridges are a part of the Atamyrat-Imamnazar-Akin railway that is going to become a part of Turkmenistan-Afghanistan- Tajikistan trunk railway.
The track is constructed on reinforced concrete ballastless plates. The project involved the construction of bank protection facilities and several service buildings, structures, and utility lines. These Class 1 bridges have an 8-metre high and 60-metre wide under-bridge ship clearance. Both bridges can resist 9-point earthquakes. More than 500,000 cubic metres of soil have been excavated during the construction and two kilometres of bank protection have been built.
- Budget: $86m
- Bridge length: 363 m and 256 m
- Bank protection: 2 km
- Under-bridge ship clearance: 8 m high, 60 m wide