Budget: $400m
Terminal area: 58,000 m2
Passenger capacity: 3,100 people per hour
Three-level car parking for 600 cars
Overhead access road Bus station
Altcom is an experienced general contractor for airport terminals. Our specialists have performed turnkey construction of passenger terminals and other airport infrastructural facilities.
As part of Ukraine’s efforts to host Euro 2012, we have built a new terminal (58,000 m2 ) for Donetsk International Airport with an overpass, three-level parking for 605 cars, bus station, and other facilities.
The new terminal is designed to provide maximum comfort for passengers. A system of gates and boarding bridges allows passengers to enter the terminal directly from a plane. Covered galleries lead to the parking and bus station. Arrival and Departure zones are separated which is very convenient for passengers.
The renovation of Donetsk International Airport involved the construction of the highest air traffic control tower in Ukraine equipped with up-to-date equipment. Terminal area: 58,000 m2 Waiting area: 5,000 m2 Commercial area: 4,000 m2 Hourly passenger capacity: 3,100 Bus station Three-level parking for 605 cars
The new terminal is designed to provide maximum comfort for passengers. A system of gates and boarding bridges allows passengers to enter the terminal directly from a plane. Covered galleries lead to the parking and bus station. Arrival and Departure zones are separated which is very convenient for passengers.
The renovation of Donetsk International Airport involved the construction of the highest air traffic control tower in Ukraine equipped with up-to-date equipment. Terminal area: 58,000 m2 Waiting area: 5,000 m2 Commercial area: 4,000 m2 Hourly passenger capacity: 3,100 Bus station Three-level parking for 605 cars








